Monday, February 21, 2011

Wedding Quilt Part 6

I just finished adding the HST's
to the 2 1/2" strips.













Now to add to the square.
Of course there will be some ripping
and re-sewing involved.

You can't make a quilt without
having to rip.

Below is block one (out of 20)
that I have finished.












My next Wedding Quilt post
will be when I have finished
the other 19 blocks.
Maybe in April sometime ! !
Hopefully sooner but . . . . .
But after the blocks are done the
rest of the quilt should go by quick and easy ! !
(Famous last words ! !)

See you then ! !

Thanx for stopping by ! ! !

Wednesday, February 9, 2011

Wedding Quilt Part 5

Now the the strips are cut
it's time to . . . . .

SEW ! ! ! !


PRESS ! !


CUT  ! ! !
(enough to add to HST's)





SEW ! ! ! !
black square to strip ! !


CUT ! !
and PRESS ! !















Until till next week ! ! !

Friday, February 4, 2011

Wedding Quilt Part 4

It's a stripping time ! !

No luck of winning an
Accuquilt GO !
Mom gave up and bought one at JoAnn's.
We have really used the GO !
and have dwindled down her scraps pile.

I used the Go ! to cut the 2-1/2" strips.
I need 18 strips each of the Black and Lite Blue.
PK's fiance, CD, likes Blue.

Sew I went over to moms and
got out the GO ! Cutter.


We did the process production style.
Mom cut 8" wide strips to place on top of the die !



Then it was my turn to cut the strips !




It didn't take much time at all to cut 36 strips !












Until next time ! ! !

Thursday, February 3, 2011

The day after . . . . .

Here are a few pics of the day after the blizzard !
Pic below is  . . .
View looking towards main street  !
Yes it was plowed !


Pic below is   . .
View of driveway, backyard, alley.


Pic below is  . .
View of back yard and neighbors yard. 


Below pic is  . . .
View of path from back yard to back door.












  O Where O Where can my car be ?












Here is a view looking up the street
towards Lincoln University.

 
Measuring the snow and snow drift
up against my house.


Measuring the snow at the curb.


Below is a pile of snow that
was in front of and by the
drivers door of my car.





Here is a pile of snow
that was from the back of my car
and passenger side of drivers side of car. 



Below is a view of the alley
You might be able to see
a BIG pile of snow towards the top of the pic. 
That is what I had shoveled off the driveway !












There is just WAY TOO MUCH SNOW  ! !

Tuesday, February 1, 2011

SNOW SNOW SNOW

Here in JC we are under a BLIZZARD WARNING.
Yes it is the first BLIZZARD WARNING ever recorded
in JC.
(According to our weatherman)
But the last time we had lots of snow was in 1995
and we had 18" of the white stuff.

I had already shoveled a path to the
grass (for my doggie) and the drive before
I started measuring.
I shoveled about 3-4" before the measuring.


The last measurement I took
measured about 10"












If you unable to see the
measurement just click on pic to
make bigger.

Here are some pics.

This is view from my back door looking up the alley.
This was taken in the morning.
Right past the downspout you
can see the railroad tie.



Below is the view from my front door
looking up the street.


My car in the morning before it was buried
with snow and plow drift.


Snow was blowing and coming down
very fast you could not see anything.
You might be able to see some
icicles hanging from the telephone wires.


My car a few hours later.
The snow is up to the bottom of
my back bumper and lic plate.


I already shoveled about 4"of snow off
of my deck.
Here I had measured 10".



My car alittle later and  covered with more snow.




Here is another pic of the alley from my back door.
As you can see you can't see the railroad tie anymore.


Another view from my back door
looking down the street to the main road.












There is way too much snow for me.

Hope everyone stays safe and warm.

Wednesday, January 26, 2011

Wedding Quilt Part 3 HST's

Half Square Triangles is my next
step in the making
of PK's wedding quilt.

Well  .  .  .  I could have made the HST's
the way I learned, by cutting the
fabric the size I needed then
placing the fabric right sides together and
drawing the line, sewing on each side of the line.
But that would have taken way too long.

I need to make 80 HST's.

I do have the Triangulations Program
to make HST's of any size but I 
didn't have enough ink or paper.

Soooo   .   .   .   .   .
My mom told me about another
way to make the HST's.
I can't remember where she had
seen this technique . . . .
But thought I would give it a try.

So here we go  .   .   .   .

I need to have the HST's to be 4-1/2" (4" when finished).

After a little help with the template making.
It was decided that I needed a 7" square to
make the HST's to end up the correct size.













I cut three strips WOF at 7" and then enough
for two more 7" squares.













Then I placed fabric right sides together
and cut them to be 7" square.
I need to make 20 squares to make
the 80 HST's for this quilt.












After the squares were cut, the sewing began.
Chain stitching Isewed a 1/4" seam
around the outside of each square.













OH MY ! ! ! !
30 minutes to sew all 20 blocks.

Then it was time to cut.
I placed my ruler diagonal on the block
lining the ruler corner to corner and cut.
Did the same process for
cutting another diagonal line the
other direction.














When I finished with the cutting and pressing,
I had 80 HST's.












Now all the I need to to is
cut the dog ears off.

From the time I started sewing
till the time I ended pressing,
It only took me 40 minutes.

TAAAADAAAAAA ! !
80 -- 4 1/2"  (4" when finished) Half Square Triangles

I think that is pretty darn good
80 HST's done in 40 minutes.


Till next time ! ! ! !